Project: Connector
Location: Zaventem
Contractor: Temporary association Cit Blaton & CEI De Meyer
Architect and engineering office: CTHM (Chapman Taylor – Buro Happold – MOSS)
Location: Zaventem
Contractor: Temporary association Cit Blaton & CEI De Meyer
Architect and engineering office: CTHM (Chapman Taylor – Buro Happold – MOSS)
Technical details:
- total area: 32 850 m²
- surface area: 11 000 m²
- length: 200m, width: 50 m
- number of storeys: tarmac level +2
- execution time: 22 months
- quantity of concrete: 4 670 m³
REALIZATIONS
![UHPC pedestrian bridge](https://www.ergon.be/wp-content/uploads/2019/10/P1222205REW-510x382.jpg)
![Waterloo Museum](https://www.ergon.be/wp-content/uploads/2016/03/realisatie4TUMP-400x284-1.jpg)
![Trebel](https://www.ergon.be/wp-content/uploads/2017/06/Trebel-6875W-510x382.png)
![Connector](https://www.ergon.be/wp-content/uploads/2016/03/realisatie2_1-400x284-1.jpg)
![Scholen van morgen (Schools of tomorrow)](https://www.ergon.be/wp-content/uploads/2017/06/Bree-2857W-510x382.png)